General GM Chat When starting new posts, please specify YEAR, MAKE, MODEL, ENGINE type, and whatever modifications you have made. Chat about all things GM (and related cars). Off-topic stuff should be in the Lounge, and all Model specific mechanical problems should be posted in the proper forum.
View Poll Results: In my situation, should I
run the car till it dies saving up for SSEi?
72.73%
repair the car,because they are simple fixes?
27.27%
do something else? (leave a note)
0
0%
Voters: 11. You may not vote on this poll

Opinions needed... long lead in story.

Thread Tools
 
Search this Thread
 
Old Oct 30, 2007 | 12:49 AM
  #1  
bmsgaffer86's Avatar
Thread Starter
Senior Member
Posts like a Corvette
 
Joined: Jan 2003
Posts: 1,250
Likes: 0
bmsgaffer86 is on a distinguished road
Default Opinions needed... long lead in story.

OK. So i just got back from a crazy weekend. It involved a retreat at Seneca Lake, OH. But ill start with some background info:

My car was starting to have this problem: on hot days after city driving then getting on the interstate the car would randomly drop out of OD and remain that way till i pulled over and restarted the car. Usually it would be fine the rest of the way. I assumed this was a heat related problem but the trans oil was full and still clean and red looking; and i havent been able to plug in my converter box to run the laptop on my car.

Back to this weekend; It is a 200 mile drive, and the drive there was rather uneventful, my baby made it all the way no problems besides the deep knocking i hear after long trips from the engine/transmission that no one has been able to find. But it has done that since we bought it at 40k miles and is now approaching 113k miles and its just a little louder.

The way home was a bit different. I had to get back to Cincy asap to get to work on time so I averaged about 80-85 or so. At one point I had to pull off the highway to adjust the antenna on my trunk. When I was accelerating back onto the interstate the transmission felt like it was surging and shuddering pretty much while getting up to speed. I was fully loaded with a full trunk and three other people in the car. I have AAA gold, so i was just praying to get within 100 miles of Cincinnati before it gave up the ghost.

Surprisingly she made it all the way back with hardly any other shuddering all the way back, but i never stopped either. When i got back into town the car would feel like a slingshot. I would accelerate from a stop it would be real sluggish then it waited till high RPM then the car would 'snap' up to speed. I just had the transmission rebuilt at 75k miles and I dont want to have to do it again, I'm just not sure if she'* worth another $1800 rebuild.

Then next day (today) the car seems to run and operate normally. The only real issues are after long trips and the blasted knocking that sounds so horrid. It even sounds like its coming from down low. So my question is: Do i save my money and go for the 1999 SSei of my dreams (i dont like the 00+ style as much but if i find a good enough deal...) when she finally goes out completely? Or do i put more money into a car that is rusting its life away already (its not major yet but bad enough in the right spots)?

I have a couple long trips scheduled in December and currently my mom'* car is the only one reliable enough to take them through the mountains of Tennessee, so i would have to take hers or rent one. But i seriously doubt i could have enough money by then for a new car.. so im thinking renting is probably the best option, and keeping my car till its dead. What are your thoughts?

Problems with my car:
    Reply
    Old Oct 30, 2007 | 01:06 AM
      #2  
    petraman's Avatar
    Senior Member
    True Car Nut
     
    Joined: Jul 2006
    Posts: 5,001
    Likes: 0
    From: Granville, Ohio ~NEBF '07 Survivor~
    petraman is on a distinguished road
    Default

    Ahh, don't worry about it. I learned this the hard way: Don't worry about things until they actually happen. I know you might be thinking, well, I can't afford that, but I can't either, yet I'm still driving my car today with a slipping tranny. My tranny has been shuddering for 5k miles, but it hasn't let me down yet.
    Reply
    Old Oct 30, 2007 | 01:11 AM
      #3  
    bmsgaffer86's Avatar
    Thread Starter
    Senior Member
    Posts like a Corvette
     
    Joined: Jan 2003
    Posts: 1,250
    Likes: 0
    bmsgaffer86 is on a distinguished road
    Default

    Originally Posted by petraman
    Ahh, don't worry about it. I learned this the hard way: Don't worry about things until they actually happen. I know you might be thinking, well, I can't afford that, but I can't either, yet I'm still driving my car today with a slipping tranny. My tranny has been shuddering for 5k miles, but it hasn't let me down yet.
    Haha, I just dont want it to die when in the hills of TN away from everything and 4 good friends in the car... And i dont want to have to take 'someone elses' car
    Reply
    Old Oct 30, 2007 | 02:00 AM
      #4  
    theJMFC's Avatar
    Senior Member
    Posts like a Camaro
     
    Joined: Jan 2003
    Posts: 1,070
    Likes: 0
    From: Jenison, MI (Near Grand Rapids)
    theJMFC is on a distinguished road
    Default

    Depending on how bad the rust is (surface rust, or the car is about to break in half rust), I say it might just be worth fixing. Just installing a transmission oil cooler might keep your temps down enough that your seemingly heat-related problems might go away, or lessen. If you grab one off of a junkyard SSEi or something, it would be dirt cheap, too.

    I know exactly what you mean about rust in all the wrong places, and not knowing if it'* worth fixing a car. I had the same debate when the fuel pump was going out on my '89 LE, which had some pretty bad rust going on in the underbody. I ended up selling it, getting my '93 instead.

    As long as it still moves though, I'd drive it and save your money for the next one.
    Reply
    Old Oct 30, 2007 | 03:55 AM
      #5  
    DarkShadow's Avatar
    Senior Member
    Posts like a Corvette
     
    Joined: Jun 2005
    Posts: 1,596
    Likes: 0
    From: Berkeley, IL
    DarkShadow is on a distinguished road
    Default

    Originally Posted by petraman
    I'm still driving my car today with a slipping tranny. My tranny has been shuddering for 5k miles, but it hasn't let me down yet.
    i wouldnt be too concerned about it really, my trans has been shuddering for 35k on the 1-2 and it still hasnt let me down yet....
    Reply
    Old Oct 30, 2007 | 09:51 AM
      #6  
    tallbump's Avatar
    Senior Member
    True Car Nut
     
    Joined: Jun 2005
    Posts: 3,808
    Likes: 0
    From: Erie Pennsylvania
    tallbump is on a distinguished road
    Default

    i say, fix the problems you can as inexpensively as possible, to prolong the life of your current Boonne. I am sure there are members not too far form you who would be willing to help out.
    i would definitely start saving for the 99 though, too. (Which, y the way, is my dream too.)
    Take it from someone who gave up on his Bonne, I miss it every day, and wish I would have tried to do more to keep her going.
    But, you have to reach the point where you just can't put any more time or money into it either.
    Reply
    Old Oct 30, 2007 | 10:19 AM
      #7  
    rjolly87's Avatar
    Senior Member
    True Car Nut
     
    Joined: Jun 2003
    Posts: 7,270
    Likes: 465
    From: Las Cruces, NM
    rjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant futurerjolly87 has a brilliant future
    Default

    Really depends how you feel about the car. If it is worth it to you to keep it going, than do that, if you see no future with this car, then let it go and start saving. But dont be afraid to spend a little money on it on little things that can get big later. the longer it lasts, the longer you can save
    Reply
    Old Oct 30, 2007 | 10:46 AM
      #8  
    tallbump's Avatar
    Senior Member
    True Car Nut
     
    Joined: Jun 2005
    Posts: 3,808
    Likes: 0
    From: Erie Pennsylvania
    tallbump is on a distinguished road
    Default

    Originally Posted by rjolly87
    Really depends how you feel about the car. If it is worth it to you to keep it going, than do that, if you see no future with this car, then let it go and start saving. But dont be afraid to spend a little money on it on little things that can get big later. the longer it lasts, the longer you can save
    Yeah, that is what I was trying to say.
    Thanks for putting it a little more clearly.
    Reply
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    wjcollier07
    Lounge
    28
    Jan 22, 2007 08:22 PM
    ChaseSmith
    Pontiac
    20
    Jul 3, 2006 09:03 PM
    1992 trofeo
    Your Ride: GM Pictures & Videos
    40
    Jul 21, 2003 11:08 PM
    acg_ssei
    Audio (and aftermarket electronics)
    9
    Mar 24, 2003 02:33 PM
    egladman
    1987-1991
    3
    Feb 17, 2003 09:15 PM




    All times are GMT -4. The time now is 04:31 PM.