Evolution Part 2?
Thread Starter
Joined: Mar 2005
Posts: 41,391
Likes: 30
From: Enfield, CT






Had a request for another.. and I decided to do a show and tell.
Clean everything off the maplight plastic

Cut the donor piece out

Cut plastic where it will be transplanted and measure..sand a little..measure and measure.
Tape in place and put some JB Weld on (remove tape before you take picture
)

Allow JB Weld to set, flip piece and put JB Weld on top.

Go to sleep and wait for JB weld to cure... to be continued tomorrow.
Clean everything off the maplight plastic

Cut the donor piece out

Cut plastic where it will be transplanted and measure..sand a little..measure and measure.
Tape in place and put some JB Weld on (remove tape before you take picture
)
Allow JB Weld to set, flip piece and put JB Weld on top.

Go to sleep and wait for JB weld to cure... to be continued tomorrow.
Thread Starter
Joined: Mar 2005
Posts: 41,391
Likes: 30
From: Enfield, CT






Sand for an hour by hand.. yes...an hour. When perfect.. take pics


Spray plastic adhesion promotor and load pics while drying

Edit Post:
Spray with texture coating and post while drying


Edit..(Are you still sleepin?)
Spray first coat of paint (Babble while pics load...duh..I should press the load button huh?)

See what the end result will basically look like before a couple more coats of paint and reassembly.

Next pics will be completed project.


Spray plastic adhesion promotor and load pics while drying

Edit Post:
Spray with texture coating and post while drying


Edit..(Are you still sleepin?)
Spray first coat of paint (Babble while pics load...duh..I should press the load button huh?)

See what the end result will basically look like before a couple more coats of paint and reassembly.

Next pics will be completed project.






